Details: earthwork in excavation of foundation treanches in stoney earth mixed with boulders by manual means using crow bars, pix axe etc or by machineries including teaming of excavation bottom rough dressing braking clods maximum 5cm to 7cm & laying in layers not exceeding 0.30mtr in depth removal of loose materials levelling the bed to receive concrete as per standard specification drawing including disposal of excavated materials within initial lead of 50mtrs & initial lift of 1.5mtr compl. as per instruction of engg-in-charge. dismantalling of cc road removing the debries including all cost all complete supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry royalty and taxes of all materials, cost of all labour, t&p etc. as per the direction of engineer in charge., laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance etc all complete as per direction of engineer-in-charge. providing cement
Sector: Municipality