Details: earth excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of engineer. supply fillimg sand in f & p including cost, conveyance & royalty od sand cost of all labour cess, watering, raming etc cement concrete (1:4:8) using 4cm size b.h.g. (c. b.) metal including cost, conveyance , royalty & taxes of all materials etc. complete cement concrete (1:2:4) using 12mm size b.h.g. (c. b.) chips including cost, conveyance , royalty & taxes of all materials etc. complete rigid & smooth centering & shuttering for c.c.works including dismantling for reuse after casting etc. complete. r.c.c. m20 grade using 20mm and down graded size chips including cost conveyance etc. complete supplying fitting fixing and placing uncoated hysd bar reinforcement complete as per drawing and technical specification providing, spreading quarry in sub-base in layers not exceeding 22.5cm. includ
Sector: Municipality