Details: earthwork in hard soil within 50mtr initial lead & 1.5m lift including rough dressing and levelling the bed, depositing the oil within 50mtr filling sand with watering & ramming incl all cost pcc 1:3:6 with 40mm hgcb metal incl all cost supplying all labour t&p material for rcc m20 using 20mm & down graded hgcb chips including all the cost but excluding cost of steel & shuttering provideing dust and sub base not exceedeing 225mm thick etc provideing factory chamfered ascement concrete pavor block required strength thickness size shape made by tabble method to attain superior smooth finish finishing using pu or equvaient moulds as per manufacture specification direction of engineer in charge supplying and fixing of rolling shutter incl all cost shutter area provision of signboard
Sector: Municipality