Details: dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. leadas per direction of eic earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, t&p etc. as required for the work complete as per the direction of the engineer-in-charge. providing cement concrete for unreinforced cement concrete works of proportion (1:4:8) with 4cm. size crusher broken hard granite(cbhg) metal of approved quality and from approved quarry in foundation bed an
Sector: Municipality