Description: Construction of balance portion RCC Drain and fixing of cover slab from New Mini Park side to AWC Centre Nighaman Sahi in W No 05 of NAC Name of Work Construction of balance portion RCC Drain and fixing of cover slab from New Mini Park side to AWC Centre Nighaman Sahi in W No 05 of NAC Gudari
Details: Supplying labour, T&P for cleaning, dressing the earth heaps, bush cutting etc and removing the debries within 50.00mtr lead and also removal of existing pre cast slabs with refixing these etc. Complete. Labour engazed Construction of Coffer dam by sand bags with sewing &laying in position including all charges,labour, cost,conveyance & royalty of all materials etc. complete as per direction of Engineer-in-Charge Earth work in excavation in all kinds of soil (Ordinary, hard soil & stoney earth soil ) for foundation trenches within 50m. Initial lead and 1.5m initial lift including rough dressing and beaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per specification approved by the department. For Drain Earth work in excavation in Slushy of Soil within 50m. Initial lead and 1.5m initial lift including all charges etc complete as per specification approved by the department. For existing Drain inside Removal of excavated earth and di
Sector: Municipality