Details: earthwork in foundation & plinth trenches within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the engineer-in-charge fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of engr.-in-charge (unit-1 ) c.c.(1:3:6) with 40mm cbhg metal including cost,carriage and royalty of materials c.c. / r.c.c. work of m-20 grade with 20mm and down grade c.b chips including hoisting & laying including cost,carriage and royalty , tax of materials supplying, fitting & placing uncoated hysd bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete rigid & smooth centering & shuttering for rcc works including false works and dismantling them after casting including cost of materials complete in ground floor m.s. square jally including all cost with fitting & fixing cha
Sector: Municipality