Details: earth work in all kinds of soil including rough dressing and levelling the bed. direction of engg -in- charge conveying the excavated earth by mechanical means within 5 km lead with loading and unloading etc. complete. supplying of all materials, labour & t&p for laying sub-base in layers not exceeding 100 mm. watering and compacting to required density in omc with p.r.r. but excluding costs conveyance of sub-base materials. c:c: (1:4:8) using 4 cm. size h.g. metal (c.b) including the cost of all materials, labour etc complete. providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60kg/m2 using mechanical means as per clause 502 of mosrt&h specification for road & bridge work (4th revision) (data for 3500m2) supplying all materials, labour, t&p and applying tack coat over granular surface treated with primer etc complete. providind and laying "bituminous macadam" with hot mix
Sector: Municipality