Details: earth work in hard soil or gravelly soil within 50mtr. initial lead and 1.50mtr initial lift including rough dressing and levelling the bed not exceeding 0.014 in volume within 50mtr initial lead and 1.50 mtr initial lift including cost of all labour, t&p sundries etc complete as per direction of engineer-in-charge. supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, t&p etc. as required for the work complete as per the direction of the engineer-in-charge. providing & laying c:c: (1:4:8) using 4 cm. size h.g. (c.b) metal including the cost of all materials, labour carriage, royalty t& p and all taxes etc complete as per direction of eic. first class fly ash brick work in cement mortar (1:4) in foundation and plinth & superstructure with best quality bricks having cru
Sector: Municipality