Details: e/w in foundation in hard soil within 50mt initial lead & 1.5mt initial lift including rough dressing & breaking of clouds to maximum 5cm to 7cm in size & laying in layers not exceeding 0.3mt depth etc.as per direction of engeneer i/c. filling foundation & plinth with coarse sand including watering and ramming & including all cost carriage royalty taxes of sand etc complete. cement concreete(1:4:8)using 40mm size h.b.g. metal in f&p including all cost , carriage, royalty taxes etc. complete including t.c. of cement etc complete. cement concrete (1:2:4) with 12mm. to 20mm size size hard broken granite chips (crusher broken) including all cost, conveyance , royality etc. complete. supplying, fitting and placing uncoated hysd bar reinforcement complete as per drawing and technical specification. centering,shuttering for cc work including false work and dismantling then aftercasting including all cost comlete cost of display board & other unforseen items.
Sector: Municipality