Details: new building earth work inordinary soil within 50m. initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the engineer-in-charge. extra lift of 1.5m or part there of over the initial lift of 1.5m in all kinds of embankments and road works and ordinary earth work in general. filling in foundation, trenches and plinth with river sand, well watered and compacted in layers of 0.3 mtr, with top surface dressed and leveled to proper gradient including cost of all materials, conveyance, all taxes and royalties, loading and unloading, including cost of all labour, sundries ,t & p etc. all complete as per directions of the engineer -in-charge. providing and laying of cement concrete of grade 1: 4 :8 (1cement : 4 sand : 8 graded stone aggregate 40 mm nominal size ) of approved quality from quarry mixing in concrete mixer ,lowering and compacting in proper thickness , wa
Sector: Municipality