Details: earth excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of engineer. supply fillimg sand in f & p including cost, conveyance & royalty od sand cost of all labour cess, watering, raming etc cement concrete (1:3:6) using 4cm size b.h.g. (c. b.) metal including cost, conveyance , royalty & taxes of all materials etc. complete cement concrete (1:2:4) using 12mm size b.h.g. (c. b.) chips including cost, conveyance , royalty & taxes of all materials etc. complete rigid & smooth centering & shuttering for c.c.works including dismantling for reuse after casting etc. complete. providing, spreading quarry in sub-base in layers not exceeding 22.5cm. including watering ,compacting to the required density in o.m.c. with rolling by vibratory roller as per o.p.w.d. specifications including cost, conveyance & royalty of all materials,cost of all labour, t & p, lab
Sector: Municipality