Details: earth work excavation in hard soil within 50m initial lead & lift including rough dressing & levelling of bed at all etc complete supply of rsp dust filling in f & p duly watered & compacting with vibromax roller to achieve the required strength with all cost, tax etc supply of sand filling in f&p duly watered & rammed all etc c.c. (1:4:8) using 40mm hg metal including the cost, tax at all etc complete supply of uncoated hysd bar reinforcement with cutting, bending, binding & placing meshly to proper position including the cost, tax at all etc complete c.c. work of m-20 grade with 12mm to 20mm h.g chips laying & hoisting with machine & labours including cost, tax at all etc complete rigid smooth centering & shuttering for rcc work road cover slab 6mm thick c.p.p over rcc wall with all cost, tax etc complete lifting of excavated earth by mech means within 05km lead with all etc complete cost of display board & photographs etc
Sector: Municipality