Details: scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 meters. cleaning the existing granular base surface including removal of binding materials and other foreign materials with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous dismantling brick cement mortar under 3 m height including stacking the useful materials for reuse and removing the debries within 50 m lead. earth work in all kind of soil within 50m initial lead and 1.5m lift including rough dressing and breaking clods to maximum 5 to 7cm. and laying in layers not exceeding 0.3 m in depth and as per direction of the engineer-in-charge. filling in foundation & plinth with sand with well watered & rammed including all cost, conveyance & royalities of providing & supplying c.c (1:4:8) with 40 size hbg metal including all cost, conveyance & roy
Sector: Municipality