Details: clearing shrub jungle uprooting stumps and small bushes and trees . earth work in all kinds of soil within 50m. initial lead and 1.5m. initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the engineer-in-charge. filling foundation and plinth with sand and wel watered &rammedetc . complete including cost of sand . cement concrete (1:4:8) by using 4cm. size b.h.g. metal including cost, conveyance etc. complete. cement concrete (1:2:4) with 12mm. size hard broken granite chips (crusher broken) including all cost, conveyance , royality etc. complete. r.c.c. work of m 20 using 20mm and down graded hard granite hand broken chips including laying, hoisting, centring & shuttering with all cost, conveyance etc. complete. straightening, cutting, bending, binding tor steel rods, cranking, hooking, tying the grills & placing in proper position for r.c.c work, including cost of binding wires of 18 t
Sector: Municipality