Description: Construction of drain at Sweeper colony in W no 08 Name of Work Construction of drain at Sweeper colony in W no 08
Details: road work Earth work in hard soil or gravelly soil within 50mtr. initial lead and 1.50mtr initial lift including rough dressing and levelling the bed Filling F&P with sand well watered and rammed. C:C: (1:4:8) using 4 cm. size H.G. metal (C.B) including the cost of all materials, labour etc complete. R.C.C. work of M20 grade with 20 mm down grade chips (C.B.) including Hoisting & laying. Labour charges for cutting, bending, binding and tying the grill including the cost of M.S. rod. Rigid smooth centering and shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete in G.F. Back filling of excavated earth including watering, compacting with all cost etc complete. Carriage of excavated materials by mechanical means including loading & unloading within 5km lead. Cost towards unforeseen item & sign board
Sector: Municipality