Details: dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. earth work excavation in hard soil within initial lead of 50 m and initial lift of 1.5 m including rough dressing and levelling the bed as per the specification approved by the department and direction of engg -in- charge.20% extra carriage foundation convaying the exacavated earth away from the work site by mechnical means with in 5 km lead as per direction of eic filling in foundation with sand well watered & rammed including cost, conveyance, royalty & taxes etc. complete of all materials to work site as the specification approved by the department and direction of engg-in-charge. p:c:c: (1:4:8) using 4 cm. size h.g. (c.b) metal including the cost of all materials, labour carriage, royalty etc complete. r.c.c. work of m20 grade with 20 mm down grade chips (c.b.) including hoisting & laying (data for 15 ) rigid smooth centering and shuttering for
Sector: Municipality