Details: earth work in excavation of foundation trenches in all kind of soil up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site with all leads and lifts, t & p labour required for the work etc. complete as directed by the engineer-in-charge. filling f & p with crusher dust including all cost complete p.c.c (1:3:6) using 4cm. size bhgcb metal including the cost of all merials, labour carriage, royalty etc. complete p.c.c (1:2:4) using 12mm.size bhgcb chips including all cost complete rigid and smooth centering and shuttering for drain work incl. cost of all materials. supplying fitting and fixing of providing interlocking paver block of section of size 80 mm thick of approved quality over sand bed with cost of all materials (ref a/r 2006 p-89 item-16 data for 10 sqm add for writing charges of display board and other unforeseen item etc.
Sector: Municipality