Details: earth work excavation in all kind of soil in f&p within intial lead and lift including rough dressing and levelling the ground etc. complete. supplying and filling in foundation and plinth with sand including watering and ramming, including cost,conveyance, royalties and taxes of all materials and cost of all labour with t & p required for the work etc. complete as per direction of engineer-in-charge. supplying all materials, labour, t&p and providing cement concrete (1:3:6) using 4 cm size cb metal etc. complete. supplying all materials, labour, t&p and providing reinforced cement concrete (1:1.5:3) using 12mm to 20mmsize bhgcb chips including centering and shuttering etc. complete. g floor(column base) g floor(column ) g floor(grade beam) g floor(lintel) g floor(roof beam) g floor(roof slab) 1st floor(column) 1st floor(lintel) 1st floor(roof beam) 1st floor(roof slab) 1st floor(chajja) supplying, fitting & placing uncoated hysd reinforcement including cutting, bending,binding & pla
Sector: Municipality