Details: dismantling brick cement mortar under 3 m height including stacking the useful materials for reuse and removing the debries within 50 m lead. earth work in all kinds of soil within 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth and as per direction of the engineer-in-charge. filling foundation & plinth with sand with well watered & rammed including all cost, conveyance & royalities of material etc complete. providing & supplying c.c (1:4:8) with 40 size hbg metal including all cost, conveyance & royalities of material etc complete. providing & supplying cement concrete m 20 with 12mm & 20mm size chips for r.c.c work includeing all cost etc complete supplying, cutting, bending and placing in position hysd steel bar of fe415 complete as per drawing and technical specification including cost of materials etc. rigid and smooth centering & shuttering for rcc works including false wo
Sector: Municipality