Details: removal of old slab from drains & refixing the same after drain work is over. dismantling and removing old cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead etc. as per the direction of engineer in charge. providing & laying cement concrete of prop (1:4:8) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. complete. to the required levels including cost, conveyance, royality and taxes of all materials, cost of all labour, t&p etc. as required for the work complete and as per direction of engineer in charge providing & laying cement concrete of prop. (1:2:4) using 12mm size, screened, washed hard black crusher broken granite chips of approved quality & from approved quarry including laying in the layers not
Sector: Municipality