Details: earth excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of engineer. filling in foundation and plinth with sand including quarring, collecting, conveying, supplying and watering incuding cost, conveyance,roylaty & taxes of all materials. & cost of all labour, t & p etc. complete. s/r p c.c. (1:4:8) using 4cm. size b.h.g. (c.b.) metal including cost, conveyance & royalty of all materials, cost of all labour , labour cess, t & p, watering, curing etc. complete. cement concrete (1:2:4) using 12mm. size c.b.b.h.g chips including cost of all materials etc. complete. r.c.c. m20 grade using 20mm and down graded size chips including cost conveyance etc. complete supplying fitting fixing and placing uncoated hysd bar reinforcement complete as per drawing and technical specification rigid & smooth centering & shuttering for c.c.works including dismantling for reus
Sector: Municipality