Details: earth work excavation in f & p all kinds of soil within initial lead of 50m and initial lift of 1.5 m including rough dressing and leveling the bed. supply & filling with good river sand of approved quality including watering with cost & conveyance of materials and other necessary requirement to complete as per direction of engineer-in-charges. providing c.c (1:3:6) using 40mm siae bhg, crusher broken metal with watering, curing including cost of materials, labour etc complete as per direction engineer-in-charges. providing cement concrete (1:2:4) using 12mm to20mm size b.h.g c.b chipes with watering, curing including cost of materials, royalty & conveyance charges with all complete as per direction of engineer-in-charges. removal of 70% excavate earth and dismantle material away from work site to out site by mechanical means up to 5 km lead etc complete as per the direction of the engineer-in-charge. fitting & fixing of transparancy board.
Sector: Municipality