Details: dismantling brick or stone masonary in lime or cement mortar under 3 m height including stacking the useful materials for reuse and removing the debries within 50 m lead. earth work in hard soil or gravelly soil in f & p within 50 m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the engineer-in-charge. filling in foundation and plinth with fine course sand in 23.5cm (9") thick layers free from organic and materials, well watered and rammed including all cost conveyance, royality taxes all materials and all labour t&p articles required for the work etc complete as per the specification and direction of the engineer-in-charge. cement concrete of proportion (1:4:8) in foundation and plinth using 4cm size clean hard black crusher broken granite metal of approved quality from approved quarry including hoisting lowering & laying concrete in layers not exceeding
Sector: Municipality