Details: earth work in excavation of foundation trenches and column foundation and pits in hard soil and depositing materials within 50m initial lead and 1.5m initial lift including rough dressing and levelling the bed as per direction and specification of the eic including stacking the useful materials separately as per directions of engineer-in-charge including cost of all labour, sundries, tools & plants etc. providing and laying coarse sand in foundation and plinth filling with sand in 9" thick layers of approved quality free from dust, dirt and other foreign materials to proper line and grade, watering and ramming etc. complete with all lead, lifts de-lifts including labour charges with cost, conveyance tax and royality of all material, labour, t&p and other incidental charges etc. complete as per direction of engineer-in-charge cement concrete (1:3:6) using 4 cm size h.g. metal free from weathered & skin with cost, conveyance, royalty, taxes of all materials & labour etc. including cur
Sector: Social Development