Details: laying and jointing pvc pipe. heading earth work in excavation of foundation in all kinds of soil in foundation within 50m initially lead and 1.50m initially lifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.03mtr in depth & levelling bed etc complete as directed by the engineer-in-charges. providing and laying sand in foundation and plinth filling with sand in 9” thick layers of approved quality free from dust, dirt and other foreign materials to proper line and grade, watering and ramming etc complete with all lead, lifts de-lifts including labour charges with cost, conveyance, tax and royalty of all materials, labour, t&p and other incidental charges etc complete as per direction of engineer-in-charges. cement concrete in proportion (1:4:8) in foundation and floors using 4cm (3/2”) size clean hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not