Details: structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (m.r) centering and shuttering including strutting, propping etc. and removal of form for . suspended floors, roofs, landings, balconies and access platform (dsr.5.9.3) steel reinforcement for r.c.c work i/c straightening, cutting, bending placing in position and binding all complete upto plinth level. thermo-mechanically treated bars of grade fe-500d or more. (dsr no. 5.22.6) reinforced cement concrete work in beams, suspended floors, roofs having up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-iii) derived from natural sources : 3 graded stone a
Sector: Tourism