Details: material requisition (mr) ref:tp-1zzza-sa-rfq-0001_d5the scope shall include, but not limited to design,engineering,manufacturing,assembly,programming,configuration, calibration,fabrication, painting and coating, supply of materials, shop testing, inspection & testing,packing for delivery, installation, and commissioning, documentation, operating and maintenance manuals & transportation of floating roof rim seal fire detection & protection system supply of floating roof rim seal fire detection & protection system as per mr ref:tp-1zzza-sa-rfq-0001_d5 for crude tank.service : crude oiltank height / length: 16.8 m tank diameter: 59 m supply of floating roof rim seal fire detection & protection system as per mr ref:tp-1zzza-sa-rfq-0001_d5 for light slop tank-1service : light sloptank height / length: 15 m tank diameter: 23.5 m training of the entire system for 5 days (operation, configuration and maintenance) at nrl site for atleast 10 nos of nrl personnel training for a period of 3 d
Sector: Custom1