Details: earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. i) in ordinary soil b. mechanical means. ii) depth up to 3.00 m (with dewatering) providing and constructing temporary island for construction of pile foundation with depth of water upto 4.0m complete as per technicalspecification. bored cast-in-situ m 35 grade rcc pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lead and lift up to 1000 m. pile diameter = 1200 mm pile load test on single vertical pile in accordance with i.s. 2911 (part iv)as per technical specifications. a) initial load test (safe load = 160 t) pile load test on single vertical pile in accordance with i.s. 2911 (
Sector: Road development