Description: Painting of Operational Boundary wall from inside face only during 2023 2024 at Lilabari Airport Name of Work Painting of Operational Boundary wall from inside face only during 2023 2024 at Lilabari Airport
Details: Clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : Water thinnable cement primer Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (1 cement : 4 fine sand) Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface Finishing walls with Acrylic Smooth exte
Sector: Airport