Description: Construction of Approach Road for 400 220 132Kv Substation at Sonapur including construction of CD works RCC drain FP RCC toe wall etc Pkg H1 Name of Work Construction of Approach Road for 400 220 132Kv Substation at Sonapur including construction of CD works RCC drain FP RCC toe wall etc
Details: Part A- Approach Road Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness. In Area of light jungle. By Manual means Excavation in Marshy Soil (Excavation for roadway in marshy soil with hydraulic excavator 0.9 bucket capacity including cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections.) Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which
Sector: Power Sector