Description: Infrastructure Development of 14 fourteen Secondary Schools Rs 25 00 Lakh per School under SOPD Schemes Swarnajyoti High School Name of Work Infrastructure Development of 14 fourteen Secondary Schools Rs 25 00 Lakh per School under SOPD Schemes Swarnajyoti High School
Details: Civil Works 2.1 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: 2.1.1 All kinds of soil 11.2 Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.8 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from naturalsources : 8 graded stone aggregate 40 mm nominal sizederived from natural sources) 5.9 Centering and shuttering including strutting, propping etc. and removal of form for5.9.1 Foundations, footings, bases o
Sector: Social Development