Details: providing and constructing temporary island for construction of pile foundation with depth of water upto 4.0m complete as per technical specificationbr. no. 1/1 harangajao bazar approach road (span 4 x 25) excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (b) mechanical means(ii) with dewatering(i) depth upto 3 mbr. no. 1/1 harangajao bazar approach road (span 4 x 25) levelling course for pile capbr. no. 1/1 harangajao bazar approach road (span 4 x 25) plain/reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shutteringformwork.a.well curb,
Sector: Road development