Description: SOPD G 24 25 40 Construction of Road Embankment on Left Bank of Dikrong River NH 15 at Bahanibari to Sissapathar Bridge Approach PART 2 from Ch 11880 00m to 15140 00m including approach roads under SOPD G for the year 2024 25 Name of Work Construction of Road Embankment on Left Bank of Dikrong River NH 15 at Bahanibari to Sissapathar Bridge Approach PART 2 from Ch 11880 00m to 15140 00m including approach roads under SOPD G for the year 2024 25
Details: Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 ii)By Manual Means (a) In area of non-thorny jungle Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pitswith a lift upto 1.5 m, transporting to site, spreading, grading to required slopeand comp g actin to meet requirement of Tables 300.1 and 300.2 with a lead upto1000 m as per Technical Specification Clause 301.5 (a) Private Land Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved mater
Sector: Road development