Details: clearing and grubbing road land .(clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. (i) by manuals means. a. in the area of non thorny jungle. utility shifting, like electric poles, water supply pipes, telephone wire etc. utility shifting of distrub pipe line and fhtc of piped water supply scheme (pwss) excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 (manual method should be adopted where machines can not be deployed due to site condition) scarifying the existing bituminous road surface to a
Sector: Road development