Details: earth work in excavation for structure as per drawing and technical specification clause 305.1 including setting out , construction of shoring and bracing , removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides,and bottom and backfilling in trenches with excavated suitable material. fillling in foundation trenches as per drawing and technical specification clause 305.3.9 (i) sand filling construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. (a) private land construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the des
Sector: Road development