Details: renovation of pond df/2a: bailing out accumulated water from the tanks area with the help of power pump machines to expose the beds to sunshine till suitable for excavation in the form of earth as per direction and requirement of the deptt. etc. complete. (extra charge will be paid for placing and lifting of the power pump machine including the transportation charge etc. ) apwrd/sh&mdr/2018-19/3.10(301): excavation in marshy soil (excavation for 93.00 roadway in marshy soil with hydraulic excavator 0.9 bucket capacity including cutting and loading in tippers and disposal with in all lifts and lead upto1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections.) apwd(rr)/2020-21/3.4.: apwd(r ) 3.60 excavation in soil using hydraulic excavator ck 90 and tippers with disposal upto 1000 metres. (excavation for roadwork in soil with hydraulic excavator of0.9 bucket capacity including cutting and loading in tippers, trimmin
Sector: Fisheries