Details: annexure-i, (foundation work) mobilization (including preparation of work space, approach road, dewatering, arrangement of electricity, jungle clearing, earih filling and making all arrangement for completion of the work) and construction and supply of all materials & laboun of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such asstone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing. boring providing and installation of bored cast in situ pile of 1200 mm diameter below the pile head with m25 grade of cement concrete including the cost of reinforcement steel , cost of boring with temporary quide casting bentonite solution. all necessarry labour materials, plants and tackles etc complete as necessarry for proper execution of the job upto 7m d\from the bottom of the pile head. the unit rate include excavation, dewatering, socketing ,
Sector: Distribution