Details: pile load test on single vertical pile in accordance withis:2911(part-iv).a). initial and routine load test i) br. no. 8/4 on guabari to lutherthal road pile load test on single vertical pile in accordance withis:2911(part-iv).a). initial and routine load test ii) br. on s.k. road to kullicherra pile load test on single vertical pile in accordance withis:2911(part-iv).b. (lateral load test) i) br. no. 8/4 on guabari to lutherthal road pile load test on single vertical pile in accordance withis:2911(part-iv).b. (lateral load test) ii) br. on s.k. road to kullicherra pile integrity test. integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. test to be carried out by an approved reputed agency. item to include all incidental work to execute the jobi) br. no. 8/4 on guabari to lutherthal road pile integrity test. integrity testing for all piles by using pile driving analyser or equivalent as approved
Sector: Road development