Details: dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately dismantling dismantling of existing existing structures structures like culverts culverts, bridges bridges, retaining retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per technical specification clause 202.(c) reinforced cement concrete removal of unserviceable soil with disposal upto 1000 m lead but excluding replacement by suitable soil, which shall be paid separately as per clause 305. construction of granular sub-base by providing well graded material, s
Sector: Road development