Details: earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. ii) 3.00m to 6.00 m depth (with dewatering) providing and constructing temporary island for construction of well foundation complete as per technical specification. (a) for 6m dia. well (ii) depth of water above 2.0 m upto 3.0 m providing and constructing one span service road to reach island location from one pier location to another pier location providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and technical specification. plain/reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (n) without plasticise
Sector: Road development