Description: Replacement of existing Ground Wire with 24F Overhead OPGW from 132KV Kahilipara GSS to 132KV Dispur GSS and Commissioning of DTPC between 132KV Kahilipara and 132KV Dispur Name of Work Replacement of existing Ground Wire with 24F Overhead OPGW from 132KV Kahilipara GSS to 132KV Dispur GSS and Commissioning of DTPC between 132KV Kahilipara and 132KV Dispur
Details: OPGW Suspension Assembly with twisted link c/w pre- formed armour rods and tower bond clamps OPGW double tension pass through assembly OPGW Tension Single Dead-end Set for termination/ run-in c/w pre-formed armour rods and tower bond clamps OPGW Vibration Damper Download clamp OPGW optical Splice kit (24 fiber) including junction box. FODP (48 Fiber), Indoor type FCPC coupling with pig tails Installation Hardware Set for 24 Fiber fiber optical approach cable. 24 Fiber, Fiber Optic Approach cable Teleprotection Signaling equipment complying IEC 60834 (8-Command) and having E1/Optical interface equipment. 4E1 PDH converter
Sector: Distribution