Details: clearing & grubbing and cutting of trees 2.2 (i) (a) - clearing and grubbing of road land including up rooting rank vegetation grass,bush, shurbs saplings and trees of girth upto 300mm removal of stumps of trees cut earlier and disposal of unseviceable materials & stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal & disposal of top organic soil not exceeding 150mm in thickness.(i) by manual means- (a) in area of non thorny jungle dismentling of pavement 2.14 - dismantling of flexible pavementsdismantling of flexible pavements and disposal of dismantled materials upto alead of 100 m, stacking serviceable and unserviceable materials separately asper technical specification clause 202.ii by mechanical means(a) bituminous courses earthwork in core 3.4 (i) - construction of embankment with material obtained from borrow pits, construction of embankment with approved materials obtained from borrow pits with a lift up to 1.5m, transporating to site
Sector: Social Development