Details: structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed within a lead of 50 m. all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -all work upto plinth level: 1:2:4 ( 1 cement: 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) centring and shuttering including strutting, propping etc. and removal of form for .foundations, footings, bases of columns, etc. for mass concrete. painting with synthetic enamel paint of a
Sector: Mining