Details: cleaning ( machnically )of septic tank as per instruction of engr incharge. cleaning of septic tank including disposal of garbage manually,as per instruction of enggr incharge. cleaning /clearing chowked line septic tank and chambr to attend day to day complaint of colony including removal of slab and refixing the same,disposal of night soil up to a lead of 200.00 mtr all complete ,as per insruction of engineer -in-charge. ( 02 man power to be deployed per day ). providing, hoisting and fixing up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like including the cost of required centering, shuttering but excluding cost of reinforcement, with1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mmnominal size). steel reinforcement for r.c.c. work including straightening, cutting,
Sector: Mining