Details: item description/ heading daily cleaning work of all weigh bridges including weigh bridges plateform and weigh bridge room etc complete as per instruction of the engineer in charge(providing 16 manpower per day in two shift 08 manpower/shift) carriage of materials 1.1 by mechanical transport including loading,unloading and stacking 1.1.3 manure or sludge(8 weigh bridge =15 /per day = 10*15 = 150 ). upto 2.00km. (in every 10 day/or as when required). providing hydraulic excavator (3d) with driver and fuel for day to day cleaning or excavated suluries from weigh bridges by cleaning workers in cleaning activities.providing hydraulic excavator (3d) with driver and fuel (in every 10 day /or as when required.) total impact of gst for the purpose of ctc
Sector: Mining