Details: item description/ heading dismantling c.i. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of engineer-in-charge: above 150 mm dia up to 300 mm dia excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : all kinds of soil pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia. labour rate for laying jointing ms pipe line 250/300 mm dia complete as per instruction of eic. providing and laying flanged c
Sector: Mining