Details: dismantling of ms/g.i. pipeline of different sizes dismantling of ms pipe line including shifting from site to loading point ,loading ,unloading transporting .6’’ dia pipeline and placement/placement as per instructions of engineer i/c. • gas will be supplied by contractor • vehicle will be provided by department laying and jointing of ms pipe line including loading, unloading , transportation and placement, welding of pipes & cutting and fitting of packing (if jointing by nut-bolt).6’’ dia pipe • gas and jointing of ms nut & bolt will be supplied by contractor .• power source (vehicle mounted dg set with diesel) will be provided by contractor loading unloading of ms/g.i. pipe of different sizes (for 6’’dia pipe)scope includes loading, unloading transportation and stacking / placement as per instructions of engineer i/c.• vehicle will be provided by department total impact of gst for the purpose of ctc
Sector: Mining