Details: groove cutting in roof/ floor (soft stone) for stopping & manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) groove cutting in roof/ floor (coal) for stopping & manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) malma cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) loading of material (cement) into tub on surface within a lead of 50m. loading of material (sand) into tub on surface within a lead of 50m. loading of material (stone chips) in
Sector: Mining