Details: 1 dismantling of haulage track line of 100m length i.e. 100×2=200m rail of 30lbs in ug transportation of 100m track line (i.e. 100m×2=200m rail of 30 lbs) from surface/ old working to site of installation in ug for a lead of 2 km laying of haulage track line of 100m length with 30lbs rail on both side of the track (100m×2) in line packing including packing with materials as per direction of site incharge. malma cleaning, removal of debries from galleries, sumps,tail ends of belt conveyor, and stacking within 50m lead total impact of gst for the purpose of ctc
Sector: Mining