Details: dismantling of structural platforms of weighbridges (3000 kg each weighbridge x 2 nos. = 6000 kg (total = 6 te.)) modification for yokeless mounting (wb-25 & 31) and strengthening of structural platforms by cutting and fixing in position with welding. (3000 kg each weighbridge x 2 nos. = 6000 kg (total = 6 te.)) providing & fixing of ms flats by cutting, welding etc. providing & fixing of ms nut & bolts, size- 5/8" & 3/4" painting of platforms with ready mixed paint of approved brand with one coat primer & two coat of paint. (two nos. of wb platforms) (wt. of 01 no. wb = 14 te., wt. of 02 nos. wb = 28 te.) assistance in loading/ un-loading & placement of two nos. road weighbridges. note: the estimated cost is excluding cmpf @ 12% and cmps @ 7%. these statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 15 nos.
Sector: Mining